Part of CPR Group30+ Years' Experience in Façade Remediation

Engineered Access Systems with Powered Ascenders

Exclusive Australian distributor and authorised service provider of MODE powered ascender

Operational Advantages of Engineered Vertical Systems

Improving efficiency, control, and safety in vertical operations.

Faster Project Delivery

Reduce setup time and accelerate vertical works through powered ascent and structured deployment.

Reduced Access System Costs

Minimise labour, transport and equipment costs versus traditional scaffold-based access.

Minimal Site Disruption

Maintain building access and reduce footprint impact in occupied or constrained sites.

Controlled Material Handling

Enable stable, managed lifting of tools and materials throughout vertical works.

Access in Complex Environments

Operate efficiently in confined, occupied, or hard-to-reach high-rise environments.

Designed for Different Project Requirements

Tier 1 Contractors

Compliance & Governance Alignment

Integrates with governance, SWMS and contractor delivery frameworks.

Tier 2–3 Contractors

Improved Site Efficiency

Improves workflow, reduces labour intensity and shortens project timelines.

Rope Access Teams

Practical, On-Site Deployment

Works within standard rope-access setups for controlled lifting and daily operations.

How It Works

A controlled system integrated into standard rope-access operations.

  1. Powered Ascender

    Compact powered unit drives controlled vertical movement along the rope system.

  2. Rope System Integration

    Installed within standard rope-access setups using independent anchor and dual-line safety principles.

  3. Operator-Controlled Movement

    Operator manages ascent, positioning and load handling directly on the line.

  4. Controlled Execution

    Enables structured, stable work at height with integrated material handling.

MODE Smart Spider — power ascender operating on a façade

MODE Smart Spider
Power Ascender

A powered elevation platform that integrates with rope-access systems to support faster, controlled and lower-impact vertical works.

  • Supports lifting of tools and materials at height
  • Supports operator movement and controlled positioning
  • Compact and deployable without scaffold infrastructure
  • Reduces manual handling and physical exertion
  • Integrates with structured safety frameworks

Application Areas

Proven across a range of high-rise and complex access projects.

Facade remediation work in progress

Façade Remediation

Access and repair building façades with improved control, reduced disruption and efficient material handling.

Glazing panel installation at height

Glazing & Installation

Support installation and replacement works at height with controlled lifting and precise positioning.

Wind turbine blade maintenance

Wind Turbines

Enable inspection and maintenance of towers and blades in remote and high-access environments.

Confined space access operation

Difficult Access & Confined Spaces

Provide safe and efficient access to restricted or complex environments where traditional methods are limited.

Painting and coating application on façade

Painting & Coatings

Improve productivity and consistency across large-scale coating and repainting projects.

Infrastructure inspection work

Infrastructure & Structures

Access bridges, towers and complex structures where conventional access solutions are impractical.


Safety & Compliance

Two-Line Redundancy

Maintains dual-line safety principles at all times.

EN1891A Compatibility

Designed for use with standard 11mm static rope systems.

SWMS Integration

Supports inclusion in site-specific Safe Work Method Statements.

Controlled Operation

Enables stable, managed movement and load handling at height.

Meriton Towers Parramatta high-rise façade inspection in progress
Proven in real projects

Meriton Towers, Parramatta

Parramatta, NSWFaçade Inspection & Diagnostics60-Storey Tower

60 Storeys
Ultra high-rise inspection scope
No Scaffold
Access delivered without major infrastructure
3 Weeks Delivery
Inspection completed with 2 operators

Challenge
Extreme-height inspection on one of Parramatta's tallest towers, with high wind exposure and no viable scaffold solution.
Solution
A rope-access integrated system with optimised drop planning, enabling controlled vertical movement and efficient inspection cycles.
Outcome
Delivered access to extreme heights without major infrastructure, enabling faster inspections with high control in wind-affected conditions.

Supply, Service & Support

National Supply

Sydney-based distribution with national freight coverage and reliable delivery across project locations.

Servicing & Maintenance

Scheduled servicing, diagnostics and preventative maintenance to support system performance and longevity.

Parts Availability

Local inventory of genuine spare parts to minimise downtime and support rapid repairs.

Tech Support

Ongoing technical guidance to assist with system integration, setup and operational use on site.

P.E.A.R.S. Elevation Academy — operator training in progress

P.E.A.R.S. Elevation Academy

Operator training for safe, controlled and efficient system deployment.

Structured training designed to ensure operators can safely and effectively deploy SNL systems across a range of site conditions.

Focused on real-world application, the program supports consistent operation, improved efficiency and alignment with site safety requirements.

Delivered by experienced professionals, training integrates with existing rope-access practices and project workflows.

National Distribution & Partner Network

SNL is developing a national network of service and distribution partners to support supply, servicing and system deployment across key regions.

Partner with SNL to deliver advanced access solutions across high-rise, industrial and complex access projects.

Coverage expanding across NSW, ACT, QLD and WA.

Discuss Your Project

Get the right system configuration and support for your project requirements.

Partnership Opportunities